Keyword: extraction
Paper Title Other Keywords Page
WE2C02 Software Defined Radio Based Feedback System for Transverse Beam Excitation feedback, controls, software, detector 306
 
  • P.J. Niedermayer, R.N. Geißler, R. Singh
    GSI, Darmstadt, Germany
 
  Funding: This project has received funding from the European Union¿s Horizon 2020 Research and Innovation programme under GA No 101004730.
Controlling stored beams in particle accelerators requires specially designed RF signals, such as needed for spill control via transverse excitation. The software-defined radio (SDR) technology is adopted as a low cost, yet highly flexible setup to generate such signals in the kHz to MHz regime. A feedback system is build using a combination of digital signal processing with GNU Radio and RF Network-on-Chip (RFNoC) on a Universal Software Radio Peripheral (USRP). The system enables digitization of signals from particle detectors and direct tuning of the produced RF waveforms via a feedback controller – implemented on a single device. To allow for triggered operation and to reduce the loop delay to a few ms, custom OOT and RFNoC blocks have been implemented. This contribution reports on the implementation and first test results with beam of the developed spill control system.
 
slides icon Slides WE2C02 [2.683 MB]  
DOI • reference for this paper ※ doi:10.18429/JACoW-IBIC2023-WE2C02  
About • Received ※ 05 September 2023 — Revised ※ 12 September 2023 — Accepted ※ 15 September 2023 — Issue date ※ 30 September 2023
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEP002 Study of Visible Synchrotron Radiation Monitor on SOLEIL Booster booster, synchrotron, emittance, synchrotron-radiation 331
 
  • A. Moutardier, G. Cauchon, M. Chevrot, Z. Fan, N. Hubert, S. Kubsky, M. Labat, M. Thomasset
    SOLEIL, Gif-sur-Yvette, France
 
  In the scope of SOLEIL II, the booster must also be upgraded to reduce from 130 to 5~nm.rad the emittance of the beam delivered to the ring. Control of the emittance in the booster will become crucial to ensure the nominal performance of the storage ring injection. The SOLEIL I booster is already equipped with a Visible Synchrotron Radiation Monitor (MRSV). This equipment, made of an extraction mirror and a simple optical system, was originally planned to be used only for beam presence verification but has not been used routinely for operation since the commissioning in 2005. The control and acquisition systems had to be refreshed to be usable again and allow the beam size measurement along the booster energy ramp. The extraction mirror was replaced due to unexpected degradation leading to a second spot appearing on the camera. This paper traces back the MRSV upgrades from understanding the cause of mirror degradation until mirror replacement and the first proper beam visualisation, achieved at the beginning of 2023.  
poster icon Poster WEP002 [1.550 MB]  
DOI • reference for this paper ※ doi:10.18429/JACoW-IBIC2023-WEP002  
About • Received ※ 04 September 2023 — Revised ※ 09 September 2023 — Accepted ※ 12 September 2023 — Issue date ※ 16 September 2023
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEP033 A Schottky Tune Meter for the Fermilab Mu2E Delivery Ring FPGA, pick-up, proton, experiment 425
 
  • V.E. Scarpine, B.J. Fellenz, A. Semenov, D. Slimmer
    Fermilab, Batavia, Illinois, USA
 
  Funding: This work was supported by the U.S. Department of Energy under contract No. DE-AC02-07CH11359.
The Mu2E experiment will measure the ratio of the rate of the neutrinoless, coherent conversion of muons into electrons as a measure of Charged Lepton Flavor Violation. As part of the Mu2E experiment, a proton storage ring, called the Delivery Ring, will utilize resonant extraction to slow-spill protons to the experiment. To regulate and optimize the Delivery Ring resonant extraction process, a fast tune measurement scheme will be required. This Mu2E tune meter will measure the average tune and the tune spectrum, in multiple time slices, through the entire resonant extraction cycle of nominally 43 msec. The Mu2E tune meter utilizes vertical and horizontal 21.4 MHz Schottky detector resonant pickups, taken from the decommissioned Tevatron, as well as its receiver electronics. This paper will present the design of this Schottky tune meter as well as tune measurements from the Mu2E Delivery Ring.
 
poster icon Poster WEP033 [2.011 MB]  
DOI • reference for this paper ※ doi:10.18429/JACoW-IBIC2023-WEP033  
About • Received ※ 12 September 2023 — Revised ※ 14 September 2023 — Accepted ※ 29 September 2023 — Issue date ※ 29 September 2023
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)