Paper | Title | Page |
---|---|---|
WEP015 | Synchrotron Light Monitor for the Advanced Photon Source Booster Synchrotron | 358 |
|
||
Funding: This research used resources of the Advanced Photon Source, operated for the U.S. Department of Energy Office of Science by Argonne National Laboratory under Contract No. DE-AC02-06CH11357. A new synchrotron light monitor has been tested for the booster synchrotron of the Advanced Photon Source. Visible light synchrotron radiation is collected by a mirror on a path tangential to the electron beam orbit, and directed to an optical imaging system and camera. This is planned to be a non-intercepting, transverse beam-size monitor even with the higher stored beam charges (~17 nC) needed for the Advanced Photon Source Upgrade. In the present work, we describe the present synchrotron radiation diagnostic layout. An analysis of the synchrotron radiation power on the mirror, the optical layout with components, and features of the control system will be presented. |
||
Poster WEP015 [1.148 MB] | ||
DOI • | reference for this paper ※ doi:10.18429/JACoW-IBIC2023-WEP015 | |
About • | Received ※ 09 August 2023 — Revised ※ 08 September 2023 — Accepted ※ 14 September 2023 — Issue date ※ 02 October 2023 | |
Cite • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
WEP017 | Electron Beam at the Advanced Photon Source Linac Extension Area Beamline | 368 |
|
||
Funding: This research used resources of the Advanced Photon Source, operated for the U.S. Department of Energy Office of Science by Argonne National Laboratory under Contract No. DE-AC02-06CH11357. The Linac Extension Area has been developed into a beamline area for testing accelerator components and techniques. Beginning commissioning activities in February 2023, we have delivered the first electron beam to the Linac Extension Area at the Advanced Photon Source at 425 MeV. In the present work, we outline the stages of re-commissioning the electron beamline. We summarise measurements of the electron beam transport through the accelerator. We outline scenarios used to verify the adequacy of radiation shielding of the beamline, and measured shielding performance. |
||
Poster WEP017 [1.140 MB] | ||
DOI • | reference for this paper ※ doi:10.18429/JACoW-IBIC2023-WEP017 | |
About • | Received ※ 10 August 2023 — Revised ※ 08 September 2023 — Accepted ※ 14 September 2023 — Issue date ※ 30 September 2023 | |
Cite • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |