Paper | Title | Page |
---|---|---|
MO1I00 |
Opening of IBIC 2023 | |
|
||
Welcome to Saskatoon, Canada for the 12th International Beam Instrumentation Conference. | ||
Slides MO1I00 [2.249 MB] | ||
Cite • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
MO1I01 |
Overview of Canadian Accelerators | |
|
||
MeV class accelerators were introduced in Canada in 1947 with the commissioning of the world’s first microtron producing 4.6 MeV electrons. Through the early years a variety of machines were realized driven by, primarily, sub-atomic physics science pursuits. Two main centres of accelerator activity have emerged in Canada; at TRIUMF in Vancouver and CLS in Saskatoon. A number of smaller accelerators dot the country for medical and other applications. Industrial companies have formed to supply accelerators or accelerator sub-systems. The talk will give a brief historical overview of accelerator development in Canada, describe the present status and provide an overview of future initiatives. | ||
Slides MO1I01 [18.481 MB] | ||
Cite • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
MO3C05 | Canadian Light Source Beam Position Visualization Tool | 24 |
|
||
The CLS Orbit Correction (OC) system acquires, collates, and publishes storage ring beam centroid position information from 48 beam position monitors (BPMs) at a rate of 1000 samples per second. We present a "Storage Ring Beam Position Visualization Tool" that computes and displays dynamic Fast Fourier Transforms (FFTs) and Cumulative Power Spectral Densities (CPSDs) for all BPMs in real-time using full resolution data. The computed FFTs and CPSDs can be plotted in various combinations and in waterfall plots that allow visualization of changes over long periods of time. In addition, correlations between all BPM channel combinations are computed and ranked. Data from any two BPM channels can be selected for plotting in two dimensions wherein correlations are visually apparent. Computed CPSDs are further binned and published in scalar EPICS PVs which are archived for further analysis. Preliminary results from the Beam Position Visualization Tool have proven useful in characterizing beam position noise at the CLS. | ||
Slides MO3C05 [197.014 MB] | ||
DOI • | reference for this paper ※ doi:10.18429/JACoW-IBIC2023-MO3C05 | |
About • | Received ※ 17 July 2023 — Revised ※ 16 August 2023 — Accepted ※ 13 September 2023 — Issue date ※ 26 September 2023 | |
Cite • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
MO3I06 |
Industry Introductions | |
|
||
Opportunity for Industry to provide a brief introduction to the audience. | ||
Slides MO3I06 [3.378 MB] | ||
Cite • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
TU3I06 |
Industry Introductions | |
|
||
Opportunity for Industry to provide a brief introduction to the audience. | ||
Slides TU3I06 [2.144 MB] | ||
Cite • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
TH2I05 |
Closing of IBIC 2023 | |
|
||
Summary and closing of 12th International Beam Instrumentation Conference. | ||
Slides TH2I05 [8.883 MB] | ||
Cite • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |