Author: Rojec, U.
Paper Title Page
WEP043 Upgrade of the ELBE Timing System 446
 
  • M. Kuntzsch, M. Justus, A. Schwarz, K. Zenker
    HZDR, Dresden, Germany
  • L. Krmpotić, U. Legat, Ž. Oven, L. Perusko, U. Rojec
    Cosylab, Ljubljana, Slovenia
 
  The CW elec­tron ac­cel­er­a­tor ELBE is in op­er­a­tion for more than two decades. The tim­ing sys­tem has been patched sev­eral times in order to meet chang­ing re­quire­ments. In 2019 the de­vel­op­ment of a new tim­ing sys­tem based on Micro Re­search Fin­land Hard­ware has been started which is de­signed to unify the het­ero­ge­neous struc­ture and to re­place ob­so­lete com­po­nents. In spring 2023 the de­vel­op­ment of the soft­ware has been ac­com­plished, which in­cluded the map­ping of op­er­a­tion mode and dif­fer­ent com­plex beam pat­terns onto the ca­pa­bil­i­ties of the com­mer­cial plat­form. The sys­tem gen­er­ates com­plex beam pat­terns from sin­gle pulse, to macro pulse and 26 MHz cw op­er­a­tion in­clud­ing spe­cial trig­gers for di­ag­nos­tics and ma­chine sub­sys­tems. The con­tri­bu­tion will de­scribe the path from re­quire­ments to de­vel­op­ment and com­mis­sion­ing of the new tim­ing sys­tem at ELBE.  
DOI • reference for this paper ※ doi:10.18429/JACoW-IBIC2023-WEP043  
About • Received ※ 06 September 2023 — Revised ※ 11 September 2023 — Accepted ※ 13 September 2023 — Issue date ※ 01 October 2023
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)