<?xml version="1.0" encoding="UTF-8"?>
<xml>
  <records>
    <record>
       <contributors>
          <authors>
             <author>Kittelmann, I.D.</author>
             <author>Baron, R.A.</author>
             <author>Bergman, E.C.</author>
             <author>Donegani, E.M.</author>
             <author>Grishin, V.</author>
             <author>Hassanzadegan, H.</author>
             <author>Kocevar, H.</author>
             <author>Milas, N.</author>
             <author>Miyamoto, R.</author>
             <author>Mohammednezhad, M.</author>
             <author>Nilen, F.</author>
             <author>Noll, D.</author>
             <author>Rosengren, K.E.</author>
             <author>Shea, T.J.</author>
             <author>Tarkeshian, R.</author>
             <author>Thomas, C.A.</author>
          </authors>
       </contributors>
       <titles>
          <title>
             Beam Instrumentation Performance During Commissioning of the ESS Normal Conducting LINAC
          </title>
       </titles>
       <publisher>JACoW Publishing</publisher>
       <pub-location>Geneva, Switzerland</pub-location>
		 <isbn>2673-5350</isbn>
		 <isbn>978-3-95450-236-3</isbn>
		 <electronic-resource-num>10.18429/JACoW-IBIC2023-TU1I02</electronic-resource-num>
		 <language>English</language>
		 <pages>136-141</pages>
       <keywords>
          <keyword>DTL</keyword>
          <keyword>linac</keyword>
          <keyword>MMI</keyword>
          <keyword>MEBT</keyword>
          <keyword>neutron</keyword>
       </keywords>
       <work-type>Contribution to a conference proceedings</work-type>
       <dates>
          <year>2023</year>
          <pub-dates>
             <date>2023-12</date>
          </pub-dates>
       </dates>
       <urls>
          <related-urls>
              <url>https://doi.org/10.18429/JACoW-IBIC2023-TU1I02</url>
              <url>https://jacow.org/ibic2023/papers/tu1i02.pdf</url>
          </related-urls>
       </urls>
       <abstract>
          Once constructed, the European Spallation Source (ESS) will be a 5MW pulsed neutron source based on a 2 GeV proton linac delivering 2.86 ms long pulses at a 14 Hz repetition rate. This paper focuses on the beam instrumentation performance during the recent linac beam commissioning up to drift tube linac (DTL) tank 4 with 74 MeV output energy. Instrumentation and measurement results will be presented for beam parameters such as current, position, energy, emittance and beam loss.
       </abstract>
    </record>
  </records>
</xml>
